Sensara Malta Properties
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 3rd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in Shell in September 2027 and with common parts finished by the end of June 2028.
Situated on the 3rd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, main bedroom with ensuite, and a study that can easily be used as another bedroom.
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A New Project of development in Marsa, estimated to be completed in Shell in September 2027 and with common parts finished by end of June 2028.
An elevated ground floor apartment consisting of an open plan kitchen/living/dining, main bathroom, main bedroom with ensuite and a study that can easily be used as another bedroom.
A spiral staircase take you to a large circa 40sqm domestic store .
Freehold
A New Project of development in the UCA of Paola. Estimated to be completed in Shell Form with common parts finished by end of year 2026.
A 4th floor penthouse consisting of an open plan kitchen/living/dining overlooking a front balcony, main bathroom, main bedroom with ensuite and balcony and a second bedroom with its own balcony as well.
Freehold
🌊 Seafront Apartment for Rent – St. Paul’s Bay, North Malta – €1,400/month 🌊
A rare opportunity to rent a large seafront apartment with unobstructed, spectacular sea views in the heart of St. Paul’s Bay.
Property Details:
Spacious and bright living room
1 double bedroom
2 single bedrooms
2 bathrooms
Fully equipped separate kitchen
Large front terrace directly facing the sea (views of Xemxija & Mellieħa)
Back terrace – ideal for BBQs
Fully air-conditioned (4 AC units)
First floor with lift
Fully furnished & ready to move into
✨ True seafront property with stunning open views – a must-see!
📞 Call or WhatsApp: 00356 79394933
A three-bedroom apartment is currently available on plan, located on the 4th floor of a brand-new block in Lija.
The layout comprises an open-plan kitchen/dining/living area with a front terrace, a box room, a main bathroom, and three double bedrooms. The master bedroom includes an ensuite bathroom and is also complemented by a terrace.
This property is being offered fully finished, including bathrooms and internal doors, and it is estimated to be completed by 2027.
Optional Garages
Located on the fourth floor, three-bedroom finished Penthouse, currently available on plan.
The layout comprises an open-plan kitchen/dining/living area with a front terrace, a main bathroom, and three double bedrooms. The master bedroom includes an ensuite bathroom, and the second bedroom is connected to a terrace.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2027.
Optional Garages
Located on the 3rd floor in a brand-new project in Lija, a three-bedroom apartment is currently available on plan.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2028.
Optional Garages
A three-bedroom apartment is currently available on plan, located on the third floor of a brand new project in Lija.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and it is estimated to be completed by 2028
Located on the third floor in a brand-new project in Lija, a three-bedroom apartment is currently available on plan.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2028
Optional Garages
Located on the third floor in a brand-new project in Lija, a three-bedroom apartment is currently available on plan.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2028.
Optional Garages
Located on the first floor in a brand-new project in Lija, a three-bedroom apartment is currently available on plan.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2028
Optional Garages
