All Properties
Located in a quiet area of Ghaxaq, three-bedroom finished ground floor apartment, currently available on plan.
The layout comprises of an open plan kitchen/dining/living, main bathroom and three-double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished including bathrooms and internal doors and is estimate to be completed by 2028. Optional garages are available at an extra price, starting from 48k.
Paola – Corner Garage with Basement & Full Airspace
Situated in Paola comes this corner garage featuring an underlying basement and full airspace. The property benefits from having entrances on two different streets, offering excellent accessibility and flexibility. With the possibility to build further, this property presents a great opportunity for development or investment.
Freehold.
St. Pauls Bay- A well-planned, 2-bedroom apartment in the sought-after Simenta area, a mere short 5-minute walk to the sea and close to all amenities, is now available for sale. This modern property, currently under construction and set to be completed by end 2026, comprises an open plan kitchen/living/dining area, 2 bedrooms, main bathroom and a balcony. To be sold fully finished including doors and bathrooms. This freehold property is an excellent opportunity for first-time buyers or investors seeking a smart rental investment in a prime location.
MQABBA – A bright and spacious, 137 sqm, 3-bedroom apartment served with a lift and offering comfortable modern living in a quiet residential area is on the market for sale. This well-presented property comprises a large open plan kitchen/living/dining area flooded with natural light through high windows, 3 bedrooms (master with en suite), main bathroom, 2 balconies and a separate laundry room. An optional garage is also available for added convenience. This well-located, light-filled home is ideal for a couple or a family looking for a spacious and comfortable property.
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 3rd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A new development project in Marsa, estimated to be completed in Shell in September 2027 and with common parts finished by the end of June 2028.
Situated on the 3rd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, main bedroom with ensuite, and a study that can easily be used as another bedroom.
A new development project in Marsa, estimated to be completed in September 2027, with common parts finished by the end of June 2028.
Situated on the 2nd floor, the apartment consists of an open-plan kitchen/living/dining, main bathroom, double bedroom, and a well-sized study that can easily be used as another bedroom.
Freehold
A New Project of development in Marsa, estimated to be completed in Shell in September 2027 and with common parts finished by end of June 2028.
An elevated ground floor apartment consisting of an open plan kitchen/living/dining, main bathroom, main bedroom with ensuite and a study that can easily be used as another bedroom.
A spiral staircase take you to a large circa 40sqm domestic store .
Freehold
A New Project of development in the UCA of Paola. Estimated to be completed in Shell Form with common parts finished by end of year 2026.
A 4th floor penthouse consisting of an open plan kitchen/living/dining overlooking a front balcony, main bathroom, main bedroom with ensuite and balcony and a second bedroom with its own balcony as well.
Freehold
A three-bedroom apartment is currently available on plan, located on the 4th floor of a brand-new block in Lija.
The layout comprises an open-plan kitchen/dining/living area with a front terrace, a box room, a main bathroom, and three double bedrooms. The master bedroom includes an ensuite bathroom and is also complemented by a terrace.
This property is being offered fully finished, including bathrooms and internal doors, and it is estimated to be completed by 2027.
Optional Garages
Located on the fourth floor, three-bedroom finished Penthouse, currently available on plan.
The layout comprises an open-plan kitchen/dining/living area with a front terrace, a main bathroom, and three double bedrooms. The master bedroom includes an ensuite bathroom, and the second bedroom is connected to a terrace.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2027.
Optional Garages
Located on the 3rd floor in a brand-new project in Lija, a three-bedroom apartment is currently available on plan.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and is estimated to be completed by 2028.
Optional Garages
A three-bedroom apartment is currently available on plan, located on the third floor of a brand new project in Lija.
The layout comprises an open-plan kitchen/dining/living with a front balcony, a main bathroom, a box room, and three double bedrooms. The master bedroom includes an ensuite bathroom.
This property is being offered fully finished, including bathrooms and internal doors, and it is estimated to be completed by 2028
